| Facility Condition Assessment (FCA): |
Planned Implementation (FCA): |
|
|
- New intercom system installed
|
- Electrical service and distribution upgrades
|
- New electric service to the building and new switch gear installed
|
- Interior finish upgrades (i.e. paint, carpet, ceiling tile, flooring, etc.)
|
- All remodeled areas received new finishes including lighting
|
|
|
- New heat and cooling system installed in remodeled areas as well as temperature control
|
- Interior cabinet upgrades
|
- New classroom casework installed in 6 classrooms
|
|
|
|
| Program Compatibility Assessment (PCA): |
Planned Implementation (PCA): |
|
|
- Expansion of 2 classrooms, a computer lab,a flex classroom, a literacy lab
|
- Art and music room additions/remodel
|
- New music classroom and remodeled Art room
|
|
|
- New gymnasium and stage/flex classroom
|
- Special Education classrooms
|
- New special ed classroom and remodel of office and lab
|
- Expand administration/student health space
|
- Remodel of administration and student health room
|
|
|
- New kitchen and remodel of gym for new cafeteria space
|
| Multi-Use Outdoor Facilities (MUOF): |
Planned Implementation (MUOF): |
- Upgrade playground surfacing, equipment, and fencing
|
- New playground equipment, play surface, and expansion of play area
|
- Provide adequate curbing and drainage
|
- Resurface of parking lot to aid drainage
|
- Replace aged and/or unsafe playground equipment
|
- New play equipment installed
|
- Make playgrounds ADA accessible
|
- New pathways to play structures
|
| Information Technology (IT): |
Planned Implementation (IT): |
- Upgrade WAN to provide capacity to support applications with high bandwidth demands
|
- New upgrade of data service to the building
|
- Upgrade LANs to provide reliable and responsive access to data, research, and information
|
- New data wiring installed throughout the building
|
- Implement VoIP to enhance communications capabilities and reduce costs
|
- New VoiIP phone system installed
|
|
|