Flatirons Elementary School
1150 7th Street
Boulder, CO 80302
720.561.4600
http://schools.bvsd.org/flatirons
Original construction date: 1956
Report Updated:  8/8/2011
Project Details

Design Advisory Team (DAT):

Staff
Scott Boesel, Principal
Stephanie Dolan
Robin Evans
Meg Harlow
Fran Klein
Lisa Morell
Jan Osburn
Mary Van Allen
Sally Wulffe

Parents 
Kevin Cooney
Beth Pommer
Terry Rodrigue
Josie Varga
Henry Vellands
John Wyatt
Melissa Zell

Contact the Flatirons DAT

DAT Meeting Schedule:

2008
April 30
May 14
May 28
September 17

Flatirons DAT Meeting Minutes 

Project Timeline

Scheduled Milestones
uSD (schematic design) due: 06/08; Completed 07/08
uDD (design development) due: 08/08; Completed 08/08
uCD (construction documents) due: 11/08
uHard Bid: 01/09
uConstruction Scheduled: 01/09 - 08/09; Completed 08/09

u= Design phase
u= Construction bidding
u= Construction phase

Project Status
Scope of Work

 

 Facility Condition Assessment (FCA):  Planned Implementation (FCA):
  •  Intercom improvements
  •  New intercom system installed
  •  Electrical service and distribution upgrades
  •  New electric service to the building and new switch gear installed
  •  Interior finish upgrades (i.e. paint, carpet, ceiling tile, flooring, etc.)
  •  All remodeled areas received new finishes including lighting
  •  HVAC upgrades
  •  New heat and cooling system installed in remodeled areas as well as temperature control
  •  Interior cabinet upgrades
  •  New classroom casework installed in 6 classrooms
  •  Interior Signage Program
  •  New building signage
 Program Compatibility Assessment (PCA):  Planned Implementation (PCA):
  •  Classroom additions
  •  Expansion of 2 classrooms, a computer lab,a flex classroom, a literacy lab
  •  Art and music room additions/remodel
  •  New music classroom and remodeled Art room
  •  Expand gym/stage
  •  New gymnasium and stage/flex classroom
  •  Special Education classrooms
  •  New special ed classroom and remodel of office and lab
  •  Expand administration/student health space
  •  Remodel of administration and student health room
  •  Cafeteria improvements
  •  New kitchen and remodel of gym for new cafeteria space
 Multi-Use Outdoor Facilities (MUOF):  Planned Implementation (MUOF):
  •  Upgrade playground surfacing, equipment, and fencing
  •  New playground equipment, play surface, and expansion of play area
  •  Provide adequate curbing and drainage
  •  Resurface of parking lot to aid drainage
  •  Replace aged and/or unsafe playground equipment
  •  New play equipment installed
  •  Make playgrounds ADA accessible
  •  New pathways to play structures
 Information Technology (IT):  Planned Implementation (IT):
  • Upgrade WAN to provide capacity to support applications with high bandwidth demands
  • New upgrade of data service to the building
  • Upgrade LANs to provide reliable and responsive access to data, research, and information
  • New data wiring installed throughout the building
  • Implement VoIP to enhance communications capabilities and reduce costs
  • New VoiIP phone system installed

 

Construction photos - April 2009

 

 

 

      

 

Construction photos - June 2009

 
New gym

 
New gym

 
New gym



Construction photos - August 2009

 
New main office and entryway

 

 
New teachers' lounge and workroom

 

 
Remodeled art room

 

 
New cafeteria converted from old gym

 

 
New gym

 

 
New playground equipment

 

 

 
New gym exterior

 

 