Project Details

Principal: David Finell

Architect: Hutton Architecture Studio

Project Manager: Dave Compton

Contractor: Golden Triangle

Original Construction Budget:

 $4,000,000

 

Transfer from Program Reserve for indirect costs (30%)

 +$1,200,000

Return to Program Reserve 02/28/09

($409,916)

Transferred to Summit Phase II

($335,508)

 Revised Project Budget:

 $4,454,574

Summit Middle School project expenditures

Bond Program expenditures

 

Design Advisory Team:

Design Input by Summit Charter Board and Faculty

Project Timeline

Scheduled Milestones
Schematic design completed 03/07
Design drawings completed 06/07
Construction documents 10/07
Bidding 10/07 - 11/07
Construction scheduled 01/08 - 08/08

Project Status

Project Status:

Project is complete. All new spaces are occupied. 

Critical issues:

None.

Budget status: 

Project within budget.

Schedule status:

Project is complete.

Scope of Work

  Read about the green building practices in this project

Facility Condition Assessment (FCA):

Planned implementation (FCA):

  • Communication systems improvements
  • New IP based phone/intercom system throughout.
  • Ventilation improvements
  • Replacement of Gym HVAC system. Installation of geothermal wells and heat pump for heating and cooling of new and limited remodeled spaces.
  • Irrigation system upgrades
  • Automatic irrigation system provided for all landscaped and non-native sod and seed areas.
  • Interior finishes upgraded (i.e. ceiling tiles, carpet, wall finishes, etc.)
  • Complete remodel of Administration and faculty office/work areas. New carpet in existing classrooms. New accessible corridor ceilings.
  • Upgrade electrical service and distribution
  • Improved electrical infrastructure in new and existing spaces.

Program Compatibility Assessment (PCA):

Planned implementation (PCA):

  • Provide general upgrade of classrooms and instructional spaces
  • Carpeting and floor finishes in new and most existing spaces.

 

  • Provide science labs and classrooms
  • (2) new science labs and (1) art studio space.
  • IMC expansion
  • New Library and support spaces including computer lab to be added.
  • Expansion of offices
  • Administration health clinic and faculty areas expanded and remodeled.

Multi-Use Outdoor Facilities (MUOF):

Planned implementation (MUOF):

  • General site improvements
  • Irrigation, sod and site improvements adjacent to building.

Information Technology (IT):

Planned implementation (IT):

  • Upgrade WAN to provide capacity to support applications with high bandwidth demands
  • Extend WAN to building, upgrade head end equipment.
  • Upgrade LANs to provide reliable and responsive access to data, research, and information
  • Upgrade existing LAN distribution. 
  • Implement VoIP to enhance communications capabilities and reduce cost
  • Install new VoIP telecommunications system.
 

 Project Photos

 
 February, 2008  

 Construction work in progress  

 Construction work in progress  Construction work in progress
 March, 2008  

Construction work in progress

 Construction work in progress  Construction work in progress


April, 2008

 

 

 

 

 

 


July, 2008

 

 

 

 

 

 

 

 

 


August/September 2008

 
Solar tubes direct natural light into the classroom and the ceiling drops
at the corner to eliminate shadows and light redirection.


Remodeled science room

 
New library addition


New library addition


New library addition


New library addition

 

 


Education Center / 6500 Arapahoe, Boulder, CO 80303 / 303-447-1010
Contact Webmaster / About this Site
© 2011 Boulder Valley School District