|
10-2009 A Greener Way to LearnThe 2006 Bond measure approval by BVSD voters has provided the district with the opportunity to build and renovate in a more sustainable way. (See pages 7-8) 05-13-09 BVSD awarded solar grantsTwo buildings, Aurora 7 (BCSIS and High Peaks) and Arapahoe Ridge will get free 10kW photovoltaic (PV) systems installed as part of a pilot grant program called "ReNew Our Schools" begun this year by the Center for ReSource Conservation (CRC).
|
|
|
|
04-07-09 Learn about geothermal system at Casey Middle SchoolEMC Engineers hosted an information meeting to discuss the geothermal system that is being installed at Casey Middle School. The system engineer gave a tour of the infrastructure that has been constructed to date and presented information about the system design and the cost analysis.
|
|
|
|
Cafeteria ConfidentialA behind the scenes look into school kitchens, specifically kitchens in BVSD. Be sure to click on the series info for additional articles about BVSD's School Food Project. Recycling 2.0Growing Greener Schools Magazine article by Dr. Ghita Carroll
|
|
|